Wednesday, May 11 - in San Diego
Domingo, Rodrigo and Fahway are here again a little after 7, removing more of the existing foundation and digging down 2' for the new foundation. I can't imagine working with a jackhammer all day, hauling out the broken concrete and then the hard clay below.
![]() |
House supported on left-front corner |
This morning I dug out the 4" ABS sewer line running along the back of the house so that it was clear for the plumbers to make the connections - I hope it is enough! It is hard work scooping the clay soil out with a trowel, putting it in a bucket and emptying the bucket.
![]() |
Cast iron waste lines |
At 10am, Daphne from Ruland Design Group came over for the site visit to examine the auxiliary building space, draw of a plot plan and get information to move forward with plans and the permitting process. It was helpful that I already had the existing floor plan for the Casita, house and property available. We have a review meeting set in 3 weeks.
I cut and soldered the rest of the pieces of copper pipe for the hot water heater and connected it to the hot water heater.
![]() |
New hot water heater just outside bathroom wall |