Thursday, May 12 - in San Diego

A bright sunny morning.

The foundation guys were here a little after 7.

The plumbers came around 9 - it is a bit complicated working around the foundation guys.

I picked Anna up at the airport around 3. Farrah and Bella were very excited to see her.๐Ÿ˜„

The plumbers cut holes in the back of both bedroom closets in order to access the pipes.

I installed the BioBidet on the toilet that was sitting in the shower area.

We thought the plumbers would be done by 5 or 6 so that we could go out to Ponce's Mexican restaurant for dinner but we kept waiting and waiting and they didn't finish until 11:30pm.๐Ÿ˜ They used 4" pipes even though I thought we had decided on 3" pipes. The larger pipes made it much harder to get all the fittings in place. The way they are running the drains will make it difficult to get into the crawlspace. I think I could have done a much better job.

Outside connection to main sewer line


Comments

Popular posts from this blog

Monday, May 2, 2022 - Woodstock to San Diego

Tuesday, May 3, 2022 - In San Diego

Sunday, May 8 - San Diego